For Immediate Release:
November 27, 2012
|
Donna Green, (850) 330-1661;
|
Resurfacing Project Complete on U.S. 98 in Mexico Beach
Chipley –Work on a 2.9-mile project located on U.S. 98 between Pine Street and the Bay County line in Mexico Beach is complete. The $715,000 project to resurface sections of the roadway, improve drainage, and safety began in September 2012.
For more Florida Department of Transportation District Three information follow us on twitter @myfdot_nwfl.
http://www.oysterradio.com e-mail manager@oysterradio.com with comments
No comments:
Post a Comment