I am happy to say that the Eastpoint Channel Dredge project is well underway. Wilco finished the berm for the island and should be dredging soon. Additionally, Coastline Construction of Eastpoint was hired to remove the top of the isthmus behind Barber's Seafood. This work is being done to prepare for the dredging. The 100' wide channel will go past the rocks on both ends of the breakwater. |
No comments:
Post a Comment